INTEGRATED ENERGY PROJECT UPDATE
Tidal Energy Project
Weather
Live Video
Archives
Technology
With the Pearson College – EnCana – Clean Current Tidal Power Demonstration Project at Race Rocks now fully underway, we are seeing a variety of activities in the preparation for the tidal generator and other components of the Integrated Energy System at Race Rocks. Look for the most recent updates at the top of this page.
A blue background relates to the tidal components, a yellow background refers to the solar components. The white background represents the Power Storage and Conditioning Component. The green background links to the Environmental sensor components of the project.
materials testing video
This video documents the Pearson College Divers carrying out installation of various materials for testing for the tidal energy project.
April, 2007.The tidal energy turbine is raised to change the bearings which had been deteriorating faster than expected.
mounting bolts for solar panels
solar panels
Cementing anchor bolts to the roof January 17, 2007 Installation of Solar Panels
January 25, 2007
Stephen Harper
PM Stephen Harper visits Race Rocks for an "ecoenergy announcement" Jan 19, 2007
Installation of Turbine
turbine on barge
turbine control panel
Installation of the turbine
Sept 27, 2006
Testing of the Turbine
in Pedder Bay
Cable Laying Aug 2006 Upper piling section Bottom Piling Installation
Laying of the cable to shore
Aug.20-22, 2006
Installation of upper piling Installation of bottom piling
Drilling Problems
drilling dredgebucket detachment
Drilling Dredging the overburden Deployment of Anchors for the
Piling July 16, 2006
hybridunit2s.jpg
solar energy
sonde sensors
Underwater Sensors at RR

projweeks.jpg
mar23placebattery.jpg
Equipment install
Students of Pearson College help with transferring 96 storage batteries March 10-12, 2006
Battery Installation,
March 2006
Electronic equipment arrives March, 2006
Cable across Island
barge.jpg
SIMS towed video chart
install fouling plates

January 2006: preliminary work on piling installation

Preliminary work for Cable laying and Pile Drilling..Nov 2005 Succession Studies on Different Substrates, summer, 2005
weather
The Race Rocks Weather
Instrument is installed at Race Rocks, Oct.26, 2005
ADCP recover
location
adcp
Deployment and Retrieval of the ADCP from the Bottom of the Channel Dock modifications for a concrete channel to carry the underwater cable: June 2005 Divers Examine two Prospective Locations for the Turbine Installation March 30, 2005 Triton and ASL Environmental Services do surface ADCP.
Tidal Energy Project Link to the Tidal Current Power Project Index
Launch of the Project at Pearson College,
racerocks.com home page