INTEGRATED ENERGY PROJECT UPDATE
The lower section of the piling was installed in September, 2006
The lower part of the piling awaits installation on the deck of the barge
The crane hoists it into position.
Lowering the lower section of the piling into the casing in the drilled hole.
Link to the Tidal Current Power Project
Images by Gary Bouman, and Garry Fletcher .