RaceRocks.com
Videocams Ecosystems History First nations Sponsors
Management Home
ENERGY
INTEGRATED ENERGY PROJECT UPDATE
Tidal Energy Project
Weather
Live Video
Archives
Technology
The lower section of the piling was installed in September, 2006
Lower piling lower piling Lower piling
The lower part of the piling awaits installation on the deck of the barge The crane hoists it into position. Lowering the lower section of the piling into the casing in the drilled hole.
Link to the Tidal Current Power Project
Images by Gary Bouman, and Garry Fletcher .
racerocks.com home page
Sitemap Contact
webmaster:
Garry Fletcher
Copyright