On July 16, 2006 the barge was moved on site for the installation of the piling. The first stage was the deployment of anchors for the positioning of the drilling barge. The following pictures were captured from the remote Camera 5.
Tidal Energy Project
Weather
Live Video
Archives
Technology
drill barge
A panoramic view of the drill barge.
barge and crane tug tugpull
Early Sunday morning they barge leaves Vancouver and arrives to be placed in position to deploy the anchors The tide is running at several knots today. So stabilization is accomplished by the two tugboats.
crew push crane
Crew on board the barge

Concrete block anchors on deck. The crane lifts an anchor block and when the barge is positioned at predetermined locations..
anchor block deck lift floatlift float
The block is lowered to the seabed Next a large buoy is raised from the deck -- swings to the rear of the barge and lowers it to the surface.
detachment detachment buoys sec nature
A catcher boat is used to .. detach the crane line from the buoy Several buoys are already in place. Second Nature stands by in the background.
2 tugs tug pushing east buoys gulls and boat
Location of three of the Buoys installed on the East sideof the channel A large flock of gulls was on the middle island during the operation.
sea lion sleeping gull cormorants guillemot
Normally at this time of year there are no sea lions present. This one turned up today. The gulls.... and cormorants .... and pigeon guillemots are not disturbed on the nesting grounds of Great Race Rocks.
anchor block
Video of anchor block inspection