|
|
|
|
|
On July 17, 2006 dredging of the overburden on the selected site was started for installation of the piling. The following pictures were captured from the
remote Camera 5. |
|
|
|
|
|
 |
 |
 |
| Removal of the dredge |
Over a meter of overburden had to be displaced in order to clear a site for the drill. |
|
 |
 |
 |
|
|
Completion of the operation |
|
|
 |
 |
| The dredge bucket on the barge.. note markings are in feet. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|