On January 11, 2006 the work commenced on installation of the piling. The first stage was the deployment of anchors for the installation of the template for drilling for the piling by the Divers from CANPAC. The following pictures were captured from the remote Camera 5. Working there in January is probably at the most difficult time of year for weather prediction.
sealion&barge second nature with barge bargebuoy
Day 1: Sealions are still on the islands at this time of the year, although the numerous storms of late have thinned their numbers. Second Nature from Pearson College guides the tugboat and barge to its location. The barge lays out some of the anchor blocks with the crane.
bargetilt.jpg catch.jpg buoy grab
The conditions today, January 11 are marginal.Plans on returning tomorrow with hopefully a better weather window. DAY 3:January 13.. The second day for good diving. The barge catches the buoy from an anchor on a bright sunny morning. After securing to the two buoys...
secnat2.jpg dive3.jpg diver2s.jpg
Second Nature brings in the third anchor buoy, and the barge winches in above the dive site. A Diver is being prepared, (in the yellow hat).
tender returns.jpg
The dive tender holds the air feed line while the diver is underwater. Preparing to return to Pedder Bay, after several dives. The next phase will be done when weather conditions improve.