Island Modifications for a Concrete Channel
to Carry the Electrical Cable |
|||||||||
Return to: Launch of the Project at Pearson College,
![]()
![]()
![]()
![]()
![]()
![]()
![]()




Old pre-existing electrical lines to the boathouse
Sod was removed carefully so it could be reinstalled after
Starting Form building
Nov. 9 2005




Nov. 21 2005, electrical cable ready for installation
Nov. 22 2005 the cables are laid in the trench
More cement for the curb
The crew from Roma Construction




Nov. 23 2005
Nov. 24 2005
Dec 2 2005 , Forms for the concrete curb




Dec 5 2005
Forms against the rock



Dec 8 2005
Last section of the curb is poured
Removing forms from poured curb covering electrical cable




Concrete pouring by the boathouse.
.
Dec 15, 2005 completed curb covering electrical cable
March 2006. re-growth
Return to the Schedule and Log Index for various phases of the Project.
Thanks to Mike and Carol Slater for the photos of the daily updates

Photos assembled by Garry Fletcher