| Feb 23/2007: The electrical wiring of the Solar panels is completed and tied into the power grid.The devices in the pictures are Charge Controllers. |
The three white panels feed into the Xantrex hybrid inverters . The fourth feeds directly in the battery bank to charge them directly from the panels. |
Feb 24. A draft copy of Solar Investigations is put up on the racerocks.com website. |
 |
 |
 |
| Jan 25/2007: view from tower of solar panels installed on the energy building. |
Solar panels on the South side of the energy building. Jan 25. Completing the 38 panel array. |
Base for solar panels constructed by Mike in December 2006. |
 |
 |
 |
| Jan 25/2007 The solar panels are laid and fastened to the frames bolted to the roof. |
The panels will lie almost horizontally in order to maximize exposure to sunlight from east to west. |
Electrical leads from the completed array which will take the wires in through the roof to the Xantrex conditioning equipment. |
 |
 |
 |
| Jan 23/2007: Solar panels are transferred from the vessel Second nature |
Mike runs the winch as usual |
Stacking on the deck for transfer across the island. |
 |
 |
 |
| Jan 17/2007 workmen from Carmanah secure bolts in the roof |
Holes are drilled in the concrete |
and the bolts are cemented in with a strong adhesive. |
 |
 |
 |
| In 2006, we received a grant from the Ministry of Mines and Energy for the installation of Solar panels to add to our integrated energy system. |
Preparation of the roofs of the Energy Centre building for the installation of the panels started in May 2006. |
The Energy Centre, with its roof prepared for the bank of solar panels. |
| Adding the solar panels in this location will not involve any increase of the human footprint on the island |
. The system will contribute at least 6.5 Kilowatts to assist in leveling the charging capacity |
Photos by Chris Garry and Mike. |